MISSION DATA: | |||
DATE | 384th BG Mission # | 8th AF Mission # | 384th PRIMARY TARGET |
1944‑12‑18 | 240 | 754 | Target: Road Junction Type: Transportation Location: Gemünd, Germany |
Weather Challenges The Plan: The 384th Bombardment Group (H) flew as the 41st Combat Wing C Group on today's mission. Clouds to above 29,500 feet, and an inoperative Gee-H ground station, forced the Group to bypass the primary target and attack the PFF secondary. Air traffic conflict forced the Group to do a 360° turn at the IP. A technical failure on the bomb run forced the high group to go around on a second run, which was accomplished successfully. The Group could not reassemble after bombing because of the weather conditions, so all squadrons returned to base separately. |
SORTIE DATA: | ||
COMBAT CREDIT | STATUS | TARGET ATTACKED (MODE) |
No |
Scrubbed: Did Not Take Off Comments: Replaced by Ground Spare Aircraft 42‑97263, possibly in planning rather than on the flight line. |
N/A |
SORTIE AIRCRAFT DATA: | ||||
TYPE | SERIAL NUMBER | SQUADRON | SQ CODE | NAME |
B-17G | 43‑38757 ⇗ | 547th | SO*L | PEASLEE'S PAYOFF |
SORTIE CREW DATA: | |||
POSITION | CREWMEMBER | UNIT | STATUS |