SORTIE REPORT #8403
MISSION DATA:
DATE 384th BG Mission # 8th AF Mission # 384th PRIMARY TARGET
1944‑12‑27 244 764 Target: Bridge (Tactical)
Type: Transportation
Location: Altenahr, Germany
Tactical Support For Troops: The 384th Bombardment Group (H) led the 1st Division in the lead A Group of the 41st Combat Wing. The lead and low squadrons bombed the primary target. The high squadron attacked the marshalling yards at Koblenz, Germany.
SORTIE DATA:
COMBAT CREDIT STATUS TARGET ATTACKED (MODE)
No Scrubbed: Did Not Take Off
Comments: Replaced by Ground Spare Aircraft 42‑38013.
N/A
SORTIE AIRCRAFT DATA:
TYPE SERIAL NUMBER SQUADRON SQ CODE NAME
B-17G 44‑6105 547th SO*P SLEEPY LAGOON
SORTIE CREW DATA:
POSITION CREWMEMBER UNIT STATUS
Sortie Report 8403 provided by 384thBombGroup.com
SortieEngine.php Rev. 3.3.2, 22 June 2022
Report generated: 24 April 2024, 9:03 PM (PDT)
Site design and content © 1999-2024 by Webmaster